Right-sizing spare parts inventory — criticality-based stocking policy, lead time management, and working capital optimization.
A typical refinery carries $50-200M in spare parts inventory. Studies show 30-50% is either over-stocked (slow-moving items that will never be used in the plant's lifetime) or under-stocked (critical items whose absence causes extended production downtime). Optimization is primarily about ensuring the right part is available at the right time.
Stocking policy from three factors:
Tier A Critical + long lead time: Hold insurance spares on-site. Tier B: Regional warehouse or vendor-held with rapid delivery. Tier C/D non-critical: Order on demand.
30-50% of typical industrial spare parts inventory is mis-stocked — optimization generates major working capital benefit
Stocking policy must be based on criticality x lead time x failure rate — not historical practice
Capital and insurance spares for critical long-lead items are justified even at high unit cost
Slow-moving and non-moving stock should be reviewed annually and purged where no longer relevant