Platform Overview

Engineering Intelligence at Every Stage

From first-pass RUL estimate to FID-ready business case — the Astrext platform supports the full lifecycle planning workflow.

Try Sample Platform →
🏭

Asset Evaluation Engine

Input asset type, age, operating conditions, and inspection data. The platform models remaining useful life with uncertainty ranges, condition scoring, and risk flags.

Design life estimation
RUL calculation with P10/P50/P90
Degradation rate modeling
Maintenance history weighting
Asset Evaluation Engine
⚖️

Strategy Comparison Engine

Compare any combination of the 11 default strategies or create unlimited custom strategies. Side-by-side NPV, cost, reliability, and risk comparison.

11+ default strategies
Unlimited custom strategies
Side-by-side financial comparison
Sensitivity analysis
Strategy Comparison Engine
📈

Financial Forecasting

Year-by-year CAPEX and OPEX profiles over a 30-year horizon. Risk-adjusted cost ranges, downtime impact, and production loss quantification.

30-year timeline model
P10/P50/P90 cost ranges
CAPEX vs OPEX breakdown
Production loss modeling
Financial Forecasting — Interactive Model
25yr
$50M
3%
$24.6M
Total CAPEX
$29.2M
Total OPEX
$53.9M
Lifecycle Cost
$38.8M
NPV (12% DR)
'25'30'35'40'45$0M$8M$16M$24M$32M
  • Cumulative CAPEX
  • Cumulative OPEX

Adjust sliders to model different scenarios. CAPEX events triggered at strategy-defined intervals.

📊

Portfolio Optimization

Manage multiple assets simultaneously. Prioritize interventions across a portfolio by risk, criticality, and budget. Aggregate lifecycle cost dashboards.

Multi-asset dashboards
Budget allocation modeling
Risk-ranked priority lists
Aggregate CAPEX profiles
Portfolio Optimization — Budget Allocator
$25M
Allocated: $0.0MRemaining: $25.0M
Sort by:
Offshore Riser System
OffshoreRisk 9.7/10Cond 39%RUL 3yr
$0.0M
of $18M
0%
Pipeline Segment 3
PipelineRisk 9.1/10Cond 45%RUL 4yr
$0.0M
of $12.5M
0%
Gas Compressor Train A
CompressorRisk 8.4/10Cond 58%RUL 6yr
$0.0M
of $8.2M
0%
Processing Train B
ProcessRisk 5.2/10Cond 72%RUL 12yr
$0.0M
of $4.1M
0%
Utilities & Power
UtilitiesRisk 4.5/10Cond 65%RUL 9yr
$0.0M
of $2.4M
0%
LNG Storage Tank 1
StorageRisk 2.8/10Cond 81%RUL 18yr
$0.0M
of $1.8M
0%
0%
Portfolio Risk Reduction
57%
Reliability Score
0/6
Assets Addressed
Portfolio Scorecard
Risk ReductionReliabilityCoverageBudget UsedAssets Addressed

11 Default Execution Strategies

Plus unlimited custom strategies. Compare any combination side-by-side across cost, risk, reliability, and NPV.

01
Run to Failure

No planned intervention. Asset operates until unplanned failure.

Risk: HighCAPEX: Low
02
Reactive Maintenance

Repair only on breakdown. Minimal planned maintenance schedule.

Risk: HighCAPEX: Low
03
Preventive Maintenance

Time-based maintenance intervals regardless of actual condition.

Risk: MediumCAPEX: Medium
04
Predictive Maintenance

Condition data triggers maintenance at optimal intervals.

Risk: LowCAPEX: Medium
05
Condition-Based Maintenance

Continuous monitoring with threshold-triggered interventions.

Risk: LowCAPEX: Medium
06
Refurbishment

Major overhaul to restore to near-original condition without full replacement.

Risk: MediumCAPEX: Medium-High
07
Partial Replacement

Replace highest-risk or most degraded components only.

Risk: Low-MedCAPEX: Medium
08
Full Replacement

Complete replacement of asset with new equipment.

Risk: LowCAPEX: High
09
Life Extension

Targeted interventions to extend service beyond original design life.

Risk: Low-MedCAPEX: Medium-High
10
Debottleneck + Upgrade

Capacity improvement combined with life extension activities.

Risk: LowCAPEX: High
11
Decommissioning

Safe removal from service — planned end-of-life.

Risk: LowCAPEX: High

Start Using the Platform Today

Free, no credit card, no data commitments. Just practical engineering intelligence.