Asset Owners
🏗️ Asset Evaluation

Engineering-Grade Asset Evaluation in Minutes

Input your asset data once. Get a remaining useful life estimate, condition score, risk flags, and a prioritized intervention list — backed by engineering physics, not guesswork.

Start Evaluating Free
Asset Health Radar — Example Output
StructuralCorrosionMechanicalProcessElectricalInstruments0255075100
7.2 yrs
RUL
71/100
Condition
Medium
Risk

What Data Do You Need?

Astrext works with whatever data you have. The platform guides you through a structured input process — providing useful outputs even from limited data, while improving accuracy as more detail is added.

1
Asset Identification
Asset name & tag number
Asset type & sub-type
Commissioning year
Design life (years)
Operating company / site
2
Operating Conditions
Operating temperature & pressure
Fluid composition (corrosivity)
Throughput vs. design capacity
Start/stop cycle frequency
Geographic environment
3
Inspection Data
Last internal inspection date
Wall thickness measurements (UT/RT)
Corrosion rate (mm/year)
Defects identified (type, size, location)
NDE technique used
4
Maintenance History
Maintenance strategy in use
Last major overhaul date
Outstanding corrective actions
Failure history (MTBF, failure modes)
Deferred maintenance backlog

Supported Asset Types

Gas Processing Plant
🏭

Gas Processing Plant

Compression ratio
Inlet gas composition
Glycol contactor condition
Separator efficiency
Offshore Platform
🛢️

Offshore Platform

Structural fatigue life
Corrosion under insulation (CUI)
Hull condition survey
Riser/mooring integrity
Pipeline System
🔌

Pipeline System

ILI inspection findings
CP system performance
Wall thickness data
Operating pressure history
Refinery Unit
⚗️

Refinery Unit

Fired heater tube condition
Vessel wall thickness trends
Heat exchanger fouling index
Catalyst deactivation rate

What You Get Out

⏳
RUL Estimate
Remaining Useful Life with P10/P50/P90 probability distribution. Expressed in years and linked to financial planning milestones.
🎯
Condition Score
Overall 0-100 condition score plus sub-system breakdown across structural, mechanical, process, electrical, and instruments.
⚠️
Risk Flags
Identified risks flagged by severity: critical (immediate action), high (within 12 months), medium, low. Each with recommended mitigation.
📋
Intervention List
Prioritized list of recommended actions with estimated cost, urgency, and expected impact on RUL and reliability.
📊
Degradation Curve
Condition trajectory over time — baseline (no action) vs. with intervention scenarios. Visual timeline of condition decline.
💰
Cost Drivers
Identify which equipment items or systems are consuming the most maintenance budget and carrying the most residual risk.

Start Your First Asset Evaluation

Free. No credit card. Results in minutes. Data stays private.